For Asset Owners, Developers, EPC Contractors & Manufacturers
A clean exit for every module you retire.
Decommissioning is a compliance event before it is a logistics one. We manage the whole path — collection, registration, certified processing, and the documentation your regulator and your board both need.
Four things you can show
Sooner or later someone asks where the modules went — a regulator, an auditor, or a customer running a supply-chain check. These are the four places that question lands, and what we hand you for each.
-
Permitted processing
Modules are processed under permit and reported through the official channels of the jurisdiction. You receive the clearance records.
-
No landfill, no incineration
Every fraction leaves as a saleable industrial material, and the process introduces no solvents at any stage.
-
Reportable data
Per-panel mass balance feeds directly into your Scope 3 and circularity disclosures.
-
Verifiable records
Processing records that stand up to supply-chain audits and stakeholder questions.
How the engagement runs
Four stages from first call to closing documentation.
-
Assess
Volume, condition, site access and applicable regulations.
-
Collect
Packing guidance, transport arrangement, chain-of-custody handover.
-
Process
Registration, dry physical separation, per-panel record.
-
Report
Clearance documents, mass balance and carbon summary.
What you receive
Documentation is the product as much as the processing is.
- Certificate of Processing
- Per-panel mass balance record
- Regulatory clearance filing reference
- Carbon avoidance summary
- Chain-of-custody documentation
Volumes and scheduling
What we can take, and when, depends on module type, condition and how concentrated the volume is — a single repowering project and a year of rolling replacements schedule very differently. Send us the panel count, the site and the window you are working to, and we will come back with what we can commit to rather than a number that turns out not to apply to you.
-
Single-site projects
Repowering and full decommissioning, scheduled against your site programme.
-
Rolling replacement
Ongoing warranty swaps and failed-module returns, collected on a standing arrangement.
-
Manufacturing scrap
Line reject and offcut streams, handled as a continuous flow.
Tell us what you need to move.
Approximate panel count, location and timing is enough for a first assessment.